Solar project / Case 01

Harbour Works Solar

A roof-led system for a mixed-use harbour workshop, designed around daytime demand and a battery-ready next phase.

The brief

Document the constraint before the outcome.

A mixed-use harbour workshop needed solar generation that respected a fragmented roof, strong daytime demand and a later battery phase. The design started with usable roof zones and load timing before equipment selection.

BUILDING

Mixed-use workshop

SYSTEM

Roof-led array

STORAGE

Battery-ready

RESULT

Monitoring live

The system decisions

  • Explain why the array layout was chosen
  • Explain inverter and battery decisions
  • Explain cable routes, access or installation constraints
  • Explain what the monitoring setup exposes to the owner

Evidence before claims

Show what can be proved.

The demo intentionally avoids invented savings and yield figures. In a live project, measured production, consumption and project-specific warranty data can be added here once verified.

One connected system

Power should move where it is useful.

The design decides what happens first: use solar directly, charge storage, support the building later or interact with the grid according to the installed configuration.

SOLAR

generate

BUILDING

use

BATTERY

store

GRID

balance

Your roof is already there

Now make it earn its place.