Project case study
Riverside Logistics Roof
A large-roof project brief focused on operational load, access and practical installation sequencing.

LOGISTICS / COMMERCIAL
THE BRIEF
Design around the building, not around a kit.
The project starts with roof or site conditions, the demand profile, practical access and the way the system needs to be used after handover. Those constraints shape the technical brief before product selection.

PROJECT GALLERY
Show the work without making it behave.



One connected system
Power should move where it is useful.
The design decides what happens first: use solar directly, charge storage, support the building later or interact with the grid according to the installed configuration.
SOLAR
generate
→
BUILDING
use
↔
BATTERY
store
↔
GRID
balance
READY TO MAP THE ROOF?