
Solar project / Case 01
Harbour Works Solar
A roof-led system for a mixed-use harbour workshop, designed around daytime demand and a battery-ready next phase.
The brief
Document the constraint before the outcome.
A mixed-use harbour workshop needed solar generation that respected a fragmented roof, strong daytime demand and a later battery phase. The design started with usable roof zones and load timing before equipment selection.
BUILDING
Mixed-use workshop
SYSTEM
Roof-led array
STORAGE
Battery-ready
RESULT
Monitoring live
The system decisions
- Explain why the array layout was chosen
- Explain inverter and battery decisions
- Explain cable routes, access or installation constraints
- Explain what the monitoring setup exposes to the owner
Evidence before claims
Show what can be proved.
The demo intentionally avoids invented savings and yield figures. In a live project, measured production, consumption and project-specific warranty data can be added here once verified.
One connected system
Power should move where it is useful.
The design decides what happens first: use solar directly, charge storage, support the building later or interact with the grid according to the installed configuration.
SOLAR
generate
→
BUILDING
use
↔
BATTERY
store
↔
GRID
balance
Project field notes
Look closer. The roof tells the story.
Array position, access, shade, cable routes and future storage all shape a system before the first panel is fixed in place.



DESIGN CHECK
Build around the site, not around a brochure.
Every installation should make its constraints visible. That is where a credible proposal starts.
Your roof is already there